Hi, I'm Ilgin. I design complicated products.

Mostly infrastructure tools and AI. I studied cognitive science, designed at HashiCorp and IBM, and now I'm doing an MSBA to get better at the data side.

Internships from June 2027Full-time from August 2027
Ilgin's drawing of herself as an astronaut, floating with a laptop self-portrait, drawn by me

Work

The old organization dashboard, the phase 2 design with alerts, and the shipped phase 1 design in frontbeforephase 2phase 1 → live in HCP
shipped
IBM · UX research & design intern

I redesigned the HashiCorp Cloud Platform dashboard. It shipped almost exactly as I designed it.

I planned it in three phases so the first could ship with no new backend work. Support calls, customer interviews, and a heuristic audit decided what went in each phase.

intern design → production, nearly pixel for pixel

Read the case study
Plan 11 screens showing the triggered linked stacks paneltriggered linked stacks
shipped
HashiCorp · Design intern

Linking Terraform Stacks so teams can see what a change will affect

Stacks pass outputs and inputs to each other, so one change can ripple into hundreds of other stacks. I designed how people see those links, including which linked stacks a plan will trigger before they approve it.

Read the case study
Take-home, extended · AI product design

Designing how people review an AI that might be wrong

I built an AI assistant that listens to design communities for Vizcom, then redesigned its alerts so a busy GTM lead could check them fast. In testing, review time dropped from about a minute to 30 seconds, and people could actually recall what the alert said.

Read the case study

What people I worked with said

"She approached a particularly challenging and technical project with humility and curiosity, and continuously improved her design work."

Matt Terich, Director of Product Design, HashiCorp

"She was critical in setting up our UX Research team's core research method to support multiple teams across Product, Design, and Engineering."

Meredith Wong, Senior UX Researcher, IBM

"Ilgin simply dove in and used every tool at her disposal to create high-quality work."

Brian Earwood, Lead Product Designer, HashiCorp/IBM